Box-Build Assembly Coordination

Box-build hinges on revision control and acceptance — assembly drawings, harnesses and functional checks share one project baseline.

Box-build coordination

Revision lock

Align assembly drawing, BOM and cable/mechanical revisions before build.

Assembly & fastening

Follow work instructions for torque, routing and protection.

Acceptance & ship-with

Cross-check functional acceptance, labels and packing list with goods.

Project inputs & review

  • Assembly drawing, BOM and work/torque requirements
  • Cable, mechanical and packaging specifications
  • Acceptance criteria and ship-with document requirements