A printed board is a laminate and resin system that absorbs ambient moisture. The moisture itself is harmless at room temperature, but once the board reaches reflow or wave temperatures, water trapped at resin and interface boundaries expands rapidly and can drive delamination, blistering, barrel cracking, or surface defects. Moisture control is therefore not warehouse housekeeping. It is a continuous chain from fabrication and packing through transport, receiving, storage, and the moments before the board reaches the line, and project documents should say who owns each segment and against which condition.
Packing is the first controllable point in that chain. Documentation should state whether vacuum or barrier packing is required, quantity and stacking per pack, whether desiccant and a humidity indicator card are included, what the outer label must carry (part number, revision, lot, date, quantity, pack date), and what happens if a pack arrives damaged. Writing "vacuum packed" on a purchase order is not enough. Pack format, post-opening handling, and record requirements all need to be traceable, otherwise a reflow anomaly cannot be attributed. This draft specifies no packaging material grade, desiccant quantity, or card specification; those come from customer requirements and engineering confirmation.
Storage conditions need the same written treatment. Define the temperature and humidity range, whether a dry or nitrogen cabinet is required, the permitted exposure time after opening, whether bake recovery is allowed once exposure is exceeded, how recovery is recorded, and how first-in-first-out is actually executed. If the customer constrains pre-assembly exposure time, that constraint has to reach receiving and kitting, not only the quality file. Every temperature, duration, and humidity threshold must cite an applicable industry document or customer specification. Do not fill values from habit, and do not treat one project's history as a general standard.
Handoff records decide whether an anomaly can be investigated. Keep pack format and pack date, lot and quantity, desiccant and card presence, transport mode and duration, pack integrity and card reading at receiving, storage location and environmental record, opening time, and post-opening handling. If baking occurs, record the basis, the parameter source, and the execution log. Any temperature or time parameter should point at a specific specification clause and carry engineering approval. This draft defines which items to record, not the values.
Related reading: align delivery and acceptance expectations on the quality and inspection page, review base-material behaviour on the PCB materials page, and see adjacent finished-state checks in PCB quality inspection methods. Submit a confirmed package through the online quote page. Verify links and locale routes before publication.
FAQ
Do bare boards need vacuum packing?
Whether vacuum or barrier packing applies depends on the customer specification, board construction, and downstream process, and it belongs in the purchasing and manufacturing documents. This draft sets no default, but it does recommend specifying pack format, desiccant, indicator card, and label content rather than the single word "vacuum".
Can a board past its storage window be baked and used?
Whether baking is allowed, at which parameters, and whether exposure time resets must follow the applicable industry document plus customer or engineering approval. Do not set temperature and duration independently, and do not treat baking as a universal remedy.
What if the humidity indicator card reads out of range?
Follow a pre-agreed flow: record the reading and pack condition, hold the material, and let engineering decide whether bake or return evaluation is required. The point is that the flow and the decision authority exist before receiving.
- Image alt:
PCB vacuum pack with desiccant and humidity indicator card during receiving and storage records